| Furnace Structure | Double-layer stainless steel structure for maximum safetyThe bottom loading mechanism by electric hydraulic lift , which can hold 200 Kg Max. sampleWater cooling front door and sealing jacket for max. service life.Touch-screen digital control panel for all parameters.Precision temperature control with +/- 3 ºC uniformity inside the chamber and +/-0.5℃accuracy. | 
| Inside Chamber Size | Heated chamber: 500x500x500 mm ( ~ 20"x25"x25" . 125 Liter capacity )Energy-saving 1800 grade fibrous alumina insulation.High purity Al2O3 coating. | 
| Power | AC 220V, three-phase; 50/60 Hz40 KW 50Amp ( 80Aair-breaker) | 
| Heating Element | 12 Pcs SiC heating element | 
| Continuous Working Temperature | 1300°C | 
| Maximum Working Temperature | 1400°C (< 1 hr) | 
| Heating Rate | 5℃/ min | 
| Temperature Accuracy | +/- 0.5 ºC | 
| Thermocouple | Two S type thermocouples (control thermocouple and secondary alarm thermocouple) | 
| Temperature Control | Eurotherm controller with PID automatic control via SCR(Silicon Controlled Rectifier) 30 programmable segments for precise control of heating/cooling rate and dwell time.Over-temperature protection andthermocouple failure alarm functions allow operation without attendant(s).+/- 0.5 ºC temperature accuracy.RS485 Communications Port | 
| Gas Flow Control and Vacuum Valve | One flow meters ( 0~12L/min) is installed on the front panel of the furnace.One heavy-duty vacuum pump (CE certified) is built on the bottom of the furnace. is | 
| Net Weight | 3000 Kg | 
| Dimensions | |
| Warranty | One year limited warranty with lifetime support. (Consumable parts such as sample plates and heating elements are not covered by the warranty, please order the replacement at related products below.) | 
| Compliance | CE Certified for the furnace, vacuum pump, and water chiller.NRTLor CSA certification is available at extra cost.( please click mark below to learn details | 
| Application Notes | For longer service life, we recommend the heating rate not to exceed 5 ℃/min.The cooling rate shall also not exceed 5 ℃/min. Small cracks may appear on the surface of the refractory ceramics over extended use. This is a normal occurrence and the cracks may be repaired with alumina coating.The refractory block must be inserted before closing door.Attention: A two-stage pressure regulator must be installed on the gas cylinder to limit the pressure to below 3 PSI for safe operation.Click here to learnthe installation of a gas regulator. | 
| Warnings | ATTENTION: Any damages caused by the use of corrosive and acidic gasses are not under the coverage of STR-One Year Limited Warranty.In order to prevent oxidation/corrosion damages to the Mo heating elements, it is necessary to keep a constant inert gas (Ar preferred) flow throughout the entire process. This is the most effective way to carry out any by-products. | 
| Operation Instructions | 
洛阳赛特瑞高温实验炉Sintering Furnace是高温炉_高温马弗炉_实验电炉_高温电炉_真空气氛炉_热震实验炉_箱式电炉_负极材料预碳化箱式气氛炉_石墨化炉_高温电阻炉_升降电炉_工业电炉等设备和高温电炉配件生产厂家